Pool Opening & Closing

Audio Accounts Products Images

2010 Spring Check-up

Swimming Pool Summerization 2010
Re-installation of accessories removed for winterization

  • Clean and inspect filter grids or cartridges
  • Reassemble filter and pump(s)
  • Lubricate selector valve and Jandy valves
  • Test heater and pilot (LP tank must have gas)
  • Activate system (water must be at proper operating level)
  • Test pool water
  • Spa attached to pool
  • Removal of mesh pool cover (includes folding cover and locking down anchors)
  • Remove, clean, and lubricate cover anchors
  • Removal and golding of clean dry solid pool cover
  • Pool vacuuming
  • Pools with Caretaker Floor System (only on certain 1984-1987 Anthony pools)
  • Acid wash

Schedule your pool for a follow-up service and backwash within several days of summerization. The job will be done in a workmanlike manner. The results will depend on the condition of the water.

2010 Summerization Agreement